RM Analyzer Help

Construction Schedule .: Stage Activation

SettingDescription
1. Upper Table : Stages Stages of the current construction stage variant are listed in the upper table. By the actions defined in each stage a timeframe is defined and given for each of the named stages. The status of each stage indicates whether the stage has not been calculated jet -empty-, was successfully calculated 'OK' or is to be 'Skipped' for the next calculation run.
SettingDescription
ADD new stages To add a new Stage at any desired position -INSERT BEFORE- and -INSERT AFTER- buttons are used.
MODIFY stagenames and descriptions The -MODIFY- button is used to change name and description of the selected stage. The skip tag may also be changed.
COPY stages The selected stage including all definitions may be copied to the end of the stage list using the -COPY- button.
SKIP stages Stages may be skipped individually or in series by using the -RENUMBER- button.
DELETE stages To delete one or more stages use the -DELETE- button.
2. Lower Table : Element activation Element activation is listed in the lower table according to the selected stage of the upper table. All elements with changes in their activation status (ACT / DACT) are shown and may be modified or new element activations may be inserted. As the table is sorted by element number both -INSERT- buttons are used equally.